So much has happened! I cannot believe how fast these guys are! We are now on dumpster number three! Almost everything has been torn down. All of the wood and the cinder blocks have been removed today. They grated the ground for the 220 foot driveway. We decided that we needed to put a culvert (big pipe) in at the bottom of the driveway to keep the water from sitting in a pool and giving it access to keep flowing. They built it up with dirt and then will concrete it like the rest of the driveway. So exciting! Here are the pictures!
|
Driveway being grated |
|
Gutted |
|
Culvert |
|
They are putting excess dirt back here to build it up. |
No comments:
Post a Comment